Taping the gaps

I’ve covered the gaps between the floor of the structure and the boards, and the gaps between boards themselves, covering the hinges, with three staggered layers of masking tape. I’ve then painted over the tape with emulsion. The improvement is vast; the seams blend perfectly and there are no visible edges. It makes the inside look much more finished, and will help dramatically when the projection is hosted.

No comments:

Post a Comment